Concrete
Automotive shop lift footings
The floor under a new lift is cut out, reinforced, and poured back so the bay can go back to work.
Request an estimate
Rebar mat and dowel reinforcement
4000 PSI with commercial fiber mesh
High-early concrete, fast cure, minimum downtime
The footing
The existing slab is saw-cut at the lift and removed. Dowels go into the slab that stays, a rebar mat is tied in the opening, and the new concrete is 4000 PSI with commercial fiber mesh. High-early concrete is used for a fast cure and as little downtime as the shop can manage.